Implementation

Built floor by floor.

Foundations first. We load opening balances and masters before a single stock movement goes in, then build upward one floor at a time, with a sign off at each slab.

6
  • 6weeks for one plant
  • 5floor sign offs
  • 0masters retyped by your team
Schedule

Six weeks, with a check at every slab.

  1. BFoundationOpening balances, chart of accounts, item, party and tax masters
    Week 1-2
    Handover checkTrial balance agrees with your current books
  2. GGround floorWarehouses, bins, batches, opening stock by location
    Week 3
    Handover checkPhysical count matches the stock ledger
  3. 1-2Purchase and productionSuppliers, BOMs, routings, approval rules, first job cards
    Week 4
    Handover checkOne live PO and one live job card closed end to end
  4. 3Sales and despatchPrice lists, credit limits, e-invoice and e-way bill setup
    Week 5
    Handover checkFirst invoice and e-way bill raised from a despatch
  5. 4Go-live and trainingDashboards, alerts, role access and floor wise training
    Week 6
    Handover checkOld system set to read only
MilestoneLive on all floors at the end of week 6
Site survey

What we need from you.

Four things, in whatever format you already keep them.

Trial balance

As on the cut-over date, with party wise outstanding for debtors and creditors.

Item master and stock

Item list with units, and a physical count by location on the cut-over date.

BOMs and routings

For your top selling items first. The rest can follow in week 4.

One owner per floor

A person from your side who signs off each floor before we move up.

Data migration

What moves over.

Migration is quoted separately after a free data review, because a clean master of 800 items is a different job from 14,000 items across three registers.

RecordHow
Chart of accounts and groupsMapped from your current package
Customers and suppliersWith GSTIN, credit terms and opening bills
Items, units and conversionsCleaned for duplicates before import
Opening stock by batch and binFrom your physical count, not the old register
Open sales and purchase ordersPending quantities only
Price lists and rate contractsCurrent validity only
Bills of materialMulti level, with wastage
Twelve months of sales historyUsed to train the first demand forecast
Occupancy certificate

Go-live criteria.

We do not switch you over until every line is ticked.

  1. 01Trial balance in Foundepth agrees with your current books on the cut-over date
  2. 02Stock ledger agrees with the physical count at every location
  3. 03One complete chain closed: order, job card, purchase, receipt, despatch, invoice, payment
  4. 04Every user has logged in and completed their floor walkthrough
  5. 05Role permissions reviewed and signed by the owner
  6. 06Old system set to read only
After handover

Maintenance schedule.

M-01

Weeks 7 to 10: hypercare

A named implementation lead on call during your working hours, with daily check-ins for the first two weeks.

M-02

First month end close

We sit with your accountant for the first close in Foundepth and reconcile every control account.

M-03

Quarterly reviews

A look at which reports you use, which you do not, and which floor could carry more of the work.

M-04

Adding a floor later

Start with G and B, add production next year. Masters and history stay where they are.

Questions before you start.

Q01Can we go live mid-year?

Yes. Most sites cut over at the start of a month. We bring in the trial balance and open items on that date, and twelve months of sales history for forecasting.

Q02Do we have to stop our current system?

No. You run both for one to two weeks while each floor is verified. After go-live the old system is kept read only for reference.

Q03What if our item master is messy?

It usually is. The free data review in week 0 flags duplicates, missing units and inconsistent names before anything is imported.

Q04Who does the data entry?

We do the imports. Your team checks and signs off each floor. You are not asked to retype masters.

Q05Can we take longer than six weeks?

Yes. Six weeks is typical for one plant on the Plant plan. Multi plant groups usually run eight to twelve weeks, one site at a time.

Issued for review

See your own business in Foundepth.

We load a sample of your items and ledgers into a demo account, then walk you through the floors you actually run. No slides and no stock photos of a warehouse.

Demo steps
RevDescriptionStatus
ASend us an item list and a trial balanceAny format. Excel, a Tally export or a photo of the register. Ready
BWe load a sample into a private demo accountYour item codes, your parties, your opening stock. Ready
CWalk the building with your own numbers45 minutes, on a call, every floor you run.Your turn