Site type 01

Plastics & Packaging

Injection, blow and extrusion units where resin price, mould changeovers and regrind decide the month.

Elevation · Moulding plant

A moulding plant runs on three numbers: kilograms of polymer in, good pieces out and the hours a mould sits on a machine. Foundepth measures all three on the same job card, so the cost of a 20 litre container is calculated from what the shop floor actually did.

Site conditions

What pushes on this building.

Load 01

Resin moves every fortnight

Polymer rates shift with crude and import parity. A quote built on last month's rate can lose the margin before the first batch.

Load 02

Changeovers eat capacity

Every mould change costs one to three hours. Running orders in the wrong sequence quietly removes a shift each week.

Load 03

Regrind is invisible stock

Runners, flash and rejects are ground and reused, but rarely counted. Yield looks better or worse than it really is.

Load 04

Weight per piece drifts

A container that should weigh 820 g and runs at 845 g adds 3% to material cost on every piece, and nobody sees it until the stock count.

A typical order

One order, floor by floor.

How a common order moves through Foundepth in a moulding plant.

  1. 3
    Step 1 · Order Desk

    Order for 1,200 pcs of 20 L HDPE container, 820 g each, despatch on the 18th.

  2. 2
    Step 2 · Shop Floor

    Work order explodes the BOM: 984 kg HDPE, 12 kg masterbatch, 1,200 caps.

  3. 1
    Step 3 · Buy Desk

    Shortage of 40 kg HDPE raises a purchase request with the job card attached.

  4. G
    Step 4 · Stock Room

    Resin received by batch, reserved against the job card at the rack.

  5. 2
    Step 5 · Shop Floor

    Job card records shots, good pieces, rejects and kilograms sent to regrind.

  6. B
    Step 6 · Ledger Core

    Consumption, WIP and finished goods value post to the ledger the same day.

Fitted for this site

Controls that ship with it.

Configured on day one of implementation, not built as custom work later.

  • Standard weight per piece on the item, with variance flagged per batch
  • Mould master with cavities, cycle time and the machines it fits
  • Regrind as its own stock item, returned at a set percentage
  • Masterbatch and additive dosing held on the BOM by percentage
  • Machine wise output and downtime with reason codes
  • Polymer rate history by grade and supplier
Control Room

Reports this site reads every week.

  • Yield by machine and mould
  • Material cost per piece, actual vs standard
  • Changeover hours per week
  • Resin cover in days
AI insight, example

Running order 2284 before 2290 on machine 3 saves two mould changeovers this week.

Recommendation only. A person decides.
Issued for review

See your own business in Foundepth.

We load a sample of your items and ledgers into a demo account, then walk you through the floors you actually run. No slides and no stock photos of a warehouse.

Demo steps
RevDescriptionStatus
ASend us an item list and a trial balanceAny format. Excel, a Tally export or a photo of the register. Ready
BWe load a sample into a private demo accountYour item codes, your parties, your opening stock. Ready
CWalk the building with your own numbers45 minutes, on a call, every floor you run.Your turn